In modern logistics and transportation management operations, working with subcontractors is inevitable. However, not every business has a system to evaluate transportation subcontractors objectively and systematically. This article will provide detailed guidance on building a subcontractor scorecard based on actual data, helping you manage logistics subcontractors effectively and make accurate transportation contract renewal decisions.

Why You Need a Professional Transportation Subcontractor Evaluation System

Challenges When Managing Multiple Subcontractors

When logistics businesses scale up, using a network of subcontractors becomes common to meet diverse transportation needs. However, this presents many challenges:

  • Inconsistent service quality: Each subcontractor has different capabilities and operating standards, leading to inconsistent customer experiences.
  • Difficult to control incidental costs: Lack of clear data on actual performance makes price negotiation and budget control difficult.
  • Brand reputation risk: Subcontractor errors directly affect the parent company's image in the eyes of end customers.
  • Subjective decisions: Transportation contract renewal often relies on intuition or personal relationships rather than specific data.

Benefits of a Structured Evaluation System

A professional transportation subcontractor evaluation system brings many practical values:

Transparency and objectivity: Data from TMS partner evaluation provides specific metrics, eliminating subjective factors in assessing subcontractor capabilities.

Cost optimization: Identifies partners that deliver the best cost efficiency, enabling more reasonable workload allocation.

Improved service quality: Clear carrier KPIs create positive pressure, driving partners to continuously improve performance.

Quick decision-making: With a standardized subcontractor scorecard, decisions to renew or terminate contracts become simple and evidence-based.

Building a quality partner network: Transportation network optimization by retaining excellent partners and eliminating inefficient units.

Groups of Subcontractor Evaluation Criteria from TMS Data

To manage logistics subcontractors effectively, you need to establish comprehensive measurement criteria groups. Below are the main KPI groups that can be extracted from the TMS system:

Delivery Performance Criteria Group

On-Time Delivery Rate

This is the most important indicator in transportation subcontractor evaluation. TMS can automatically compare committed delivery time with actual time:

  • On-time delivery rate (within committed time window)
  • Early delivery rate (may be bonus or penalty points depending on industry)
  • Late delivery rate and average delay level

First Attempt Delivery Rate

This indicator measures the ability to complete delivery from the first contact attempt, reflecting the subcontractor's planning and coordination capabilities.

Damage/Loss Rate

Number of orders reported damaged, lost, or discrepant compared to total delivered orders.

Operational Capacity Criteria Group

Order Acceptance Rate

Reflects the readiness and service capacity of the subcontractor:

  • Number of rejected transportation orders
  • Response time when receiving new orders
  • Order cancellation rate after confirmation

Flexibility and Scalability

  • Ability to respond to urgent requests
  • Geographic coverage range
  • Capacity to handle special orders

Resource Utilization Efficiency

  • Average load factor
  • Empty km/total km ratio
  • Average completion time per trip

Customer Service Quality Criteria Group

Customer Satisfaction Index

Feedback data from end customers about their experience with the subcontractor:

  • Average rating score
  • Number of complaints about attitude, professionalism
  • Positive feedback rate

Communication and Coordination Capability

  • Message/call response time
  • Accuracy of updated information
  • Level of compliance with reporting processes

Compliance and Safety Criteria Group

Regulatory and Process Compliance

  • Complete necessary legal documents
  • Compliance with required operating processes
  • Regular certificate and license updates

Operational Safety

  • Number of accidents/incidents
  • Condition of transport vehicles
  • Driver safety certificates

Cost and Financial Criteria Group

Cost Efficiency

  • Compare actual costs with quotations
  • Frequency of unannounced surcharges
  • Average cost per unit (VND/kg, VND/km, VND/order)

Financial Discipline

  • Invoice accuracy
  • Cost dispute resolution time
  • Debt/payable status (if applicable)

Building KPI Scoring Scale and Weight for Each Criterion

After identifying evaluation criteria, the next step is building specific scoring for the subcontractor scorecard.

Principles for Establishing Scoring Scale

Ensure Measurability

Each carrier KPI needs a clear calculation formula that can be automatically extracted from TMS. For example:

On-Time Delivery Score = (Number of on-time orders / Total orders) × 100

Establish Performance Thresholds

Determine performance levels corresponding to the scoring scale:

  • Excellent (90-100 points): Exceeds expectations, achieves highest standards
  • Good (75-89 points): Fully meets requirements, stable
  • Acceptable (60-74 points): Meets minimum level, needs improvement
  • Unacceptable (<60 points): Does not meet requirements, needs contract review

Standardize to 100-point Scale

All criteria should be converted to a 100-point scale for easy comparison and aggregation.

Sample Scoring Table for Main Criteria

On-time delivery rate:

  • ≥98%: 100 points
  • 95-97.9%: 90 points
  • 90-94.9%: 75 points
  • 85-89.9%: 60 points
  • <85%: 0 points

Order acceptance rate:

  • ≥95%: 100 points
  • 90-94.9%: 85 points
  • 80-89.9%: 70 points
  • 70-79.9%: 50 points
  • <70%: 0 points

Response time (average):

  • ≤15 minutes: 100 points
  • 16-30 minutes: 85 points
  • 31-60 minutes: 70 points
  • 61-120 minutes: 50 points
  • >120 minutes: 0 points

Weight Allocation for Criteria Groups

Not all criteria have the same level of importance. Weights should reflect the company's strategy and priorities:

Balanced weight model:

  • Delivery performance: 35%
  • Customer service quality: 25%
  • Operational capacity: 20%
  • Cost and finance: 10%
  • Compliance and safety: 10%

Performance-focused weight model:

  • Delivery performance: 50%
  • Operational capacity: 20%
  • Customer service quality: 15%
  • Cost and finance: 10%
  • Compliance and safety: 5%

Experience-focused weight model:

  • Customer service quality: 40%
  • Delivery performance: 30%
  • Operational capacity: 15%
  • Cost and finance: 10%
  • Compliance and safety: 5%

You should adjust weights to suit your industry, market, and business strategy.

Total Score Calculation Formula

Total Score = Σ (Criterion Score i × Weight i)

Specific example:

  • Delivery performance: 92 points × 35% = 32.2
  • Service quality: 88 points × 25% = 22.0
  • Operational capacity: 85 points × 20% = 17.0
  • Cost and finance: 90 points × 10% = 9.0
  • Compliance and safety: 95 points × 10% = 9.5

Total Score = 89.7 points (Grade B - Good)

Process for Regular Data Collection and Processing for Evaluation

For the transportation subcontractor evaluation system to operate effectively, you need to establish a strict data collection and processing process.

Automating Data Collection from TMS

Operational Data Integration

Modern TMS partner evaluation systems can automatically record:

  • Order creation, confirmation, start, completion times
  • GPS location and actual progress
  • Exception events (delays, rejections, cancellations)
  • POD (Proof of Delivery) photos
  • Customer feedback

Financial Data Integration

Connection with accounting systems to extract:

  • Actual costs of each shipment
  • Incidental surcharges
  • Invoice and payment information

Survey and Feedback Data

  • Automated survey emails after each delivery
  • Collect ratings from end customers
  • Record complaints and resolution methods

Appropriate Evaluation Cycles

Monthly Review

  • Suitable for subcontractors with large transaction volumes (>100 orders/month)
  • Helps detect problems early and adjust promptly
  • Creates pressure to maintain consistently high performance

Quarterly Review

  • Applies to most subcontractors
  • Provides sufficient data to evaluate trends
  • Balances detail and management workload

Annual Review

  • Comprehensive evaluation to decide transportation contract renewal
  • Reviews long-term trends and development
  • Basis for negotiating new contract terms

Data Processing and Quality Control Process

Step 1: Extract Raw Data

Automatically export reports from TMS according to evaluation cycle, including all defined KPIs.

Step 2: Clean and Standardize Data

  • Remove duplicate records
  • Handle missing or abnormal data
  • Standardize time, location, unit formats

Step 3: Verify Data

  • Compare with independent data sources (if available)
  • Cross-check with customer feedback
  • Confirm exceptional cases with subcontractor

Step 4: Calculate Scores

Apply established formulas to calculate scores for each criterion and total score.

Step 5: Generate Scorecard Report

Aggregate results into visual, easy-to-understand subcontractor scorecard.

Ensure Fairness and Transparency

Announce Criteria in Advance

From contract signing, subcontractors need clear notification about:

  • Evaluation criteria and weights
  • Scoring method
  • Evaluation cycle and feedback process

Feedback and Complaint Mechanism

  • Send scorecard report to subcontractor after each evaluation
  • Allow them to explain or appeal within a specified timeframe
  • Have review and adjustment process if errors are detected

Data Storage and Security

  • Keep complete original data and calculation results
  • Secure sensitive information of each subcontractor
  • Only share data with authorized parties

Scoring Method and Subcontractor Classification (A/B/C/D)

After obtaining total scores for each subcontractor, the next step is classifying them into different grades to manage logistics subcontractors more effectively.

4-Tier A/B/C/D Classification System

Grade A - Strategic Partner (≥90 points)

These are excellent, most reliable subcontractors:

  • Outstanding performance exceeding expectations
  • Stable and consistent over time
  • Capable of handling difficult, important orders

Management strategy:

  • Priority allocation of large workloads
  • Negotiate long-term contracts with preferential terms
  • Develop deeper partnership relationships
  • Invite to participate in new expansion projects

Grade B - Good Partner (75-89 points)

Subcontractors that fully meet requirements, operate stably:

  • Performance meets expectations
  • Have some highlights and areas needing improvement
  • Reliable for standard orders

Management strategy:

  • Maintain stable workload
  • Support them to improve to Grade A
  • Renew transportation contract under standard terms
  • Regular review to ensure performance maintenance

Grade C - Partner Needing Improvement (60-74 points)

Subcontractors at acceptable level but with many issues to fix:

  • Performance only meets minimum level
  • Have periodic incidents or complaints
  • Inconsistent quality

Management strategy:

  • Reduce workload or assign only non-critical orders
  • Issue warnings and request specific improvement plans
  • Monitor closely for next 3-6 months
  • Prepare alternative options if no progress

Grade D - Does Not Meet Requirements (<60 points)

Subcontractors not meeting minimum standards:

  • Poor performance, creating risk for business
  • Serious or repeated violations
  • No signs of improvement

Management strategy:

  • Stop allocating new work immediately
  • Consider early contract termination
  • Revoke system access rights
  • Remove from partner list

Trend Analysis and Score Fluctuations

Besides reviewing scores at a point in time, transportation network optimization also requires trend analysis:

Increasing Score Trend

  • Subcontractor is continuously improving
  • Deserves increased workload and better opportunities
  • Should investigate secrets to replicate for other partners

Decreasing Score Trend

  • Warning sign requiring early intervention
  • Investigate causes: internal issues, overload, or management changes?
  • Provide support or adjust workload appropriately

Large Unstable Fluctuations

  • Reflects management or process issues
  • Need increased monitoring
  • Consider reducing dependence on this partner

Considering Contextual Factors

When classifying subcontractors, don't rely solely on numbers but consider:

Job Difficulty

Subcontractors handling difficult routes or special goods may have lower scores but still be very valuable.

Transaction Volume

With new or low-transaction subcontractors, data may not be representative enough. Should have trial period before official evaluation.

External Factors

Natural disasters, epidemics, market fluctuations can affect performance. Need flexibility in special cases.

Strategic Importance

Some subcontractors have special capabilities or exclusive coverage, even if scores aren't highest, they remain very important.

Criteria and Decision Process for Contract Renewal or Termination

Transportation contract renewal decision is one of the most important applications of the transportation subcontractor evaluation system.

Decision Matrix Based on Score and Trend

Current Grade Trend Recommended Decision
A Stable/Increasing Long-term renewal + Increase volume
A Decreasing Short-term renewal + Close monitoring
B Increasing Renewal + Opportunity for Grade A promotion
B Stable Standard renewal
B Decreasing Conditional short-term renewal
C Increasing 6-month trial renewal
C Stable/Decreasing No renewal or 3-month conditional renewal
D Any Terminate contract

Additional Criteria Beyond Scores

Ability to Meet Future Needs

  • Expansion capacity as business develops
  • Willingness to invest in new technology (GPS, IoT, mobile apps)
  • Ability to serve new markets/routes

Price Competitiveness

  • Compare costs with market and other partners
  • Price adjustment trends in the past
  • Transparency in price structure and surcharges

Financial Reliability

  • Financial situation of subcontractor (if information available)
  • Ability to meet insurance, guarantee requirements
  • Payment and debt history

Cultural and Value Alignment

  • Commitment to quality and customer service
  • Business ethics and social responsibility
  • Spirit of cooperation and openness in communication

Structured Decision Process

Step 1: Collect Complete Data (1-2 weeks before contract expiration)

  • Latest scorecard report (at least 6 months of data)
  • 12-month trend analysis
  • Feedback from related departments (operations, customer service, accounting)

Step 2: Analysis and Evaluation (1 week)

  • Compare with other subcontractors in same segment
  • Evaluate strategic importance level
  • Consider contextual and future factors

Step 3: Make Recommendations (3-5 days)

Partner manager makes recommendations based on:

  • Objective analysis results
  • Practical working experience
  • Company development strategy

Step 4: Make Decision (2-3 days)

Leadership reviews and approves:

  • Renew transportation contract (specify term, conditions)
  • Conditional renewal (set specific improvement requirements)
  • Terminate contract (with transition roadmap)

Step 5: Notification and Negotiation (1-2 weeks)

  • Notify decision to subcontractor
  • Negotiate new terms (if renewing)
  • Prepare contingency plan (if not renewing)

Step 6: Archive and Monitor

  • Keep decision records and basis
  • Monitor implementation of improvement commitments (if any)
  • Update in partner management system

Handling Special Cases

Low-scoring Subcontractor That Cannot Be Replaced Immediately

  • Short-term renewal with clear improvement terms
  • Simultaneously actively seek and develop replacement partners
  • Establish specific KPIs and monthly review

High-scoring Subcontractor Requesting Sudden Price Increase

  • Analyze reasonableness of request
  • Compare with market and other partners
  • Negotiate based on value they bring (evidenced by scores)
  • If no agreement, consider gradual shift to other partners

Promising but Inexperienced Subcontractor

  • Give trial opportunity with small volume, low-risk orders
  • Support training and best practice sharing
  • Evaluate after 3-6 months to decide long-term development

Applying Evaluation Results to Optimize Transportation Partner Network

The transportation subcontractor evaluation system is not just for contract renewal decisions, but also a powerful tool to optimize the overall transportation network.

Workload Allocation Based on Performance

80/20 Principle

Allocate 80% of important workload to top 20% subcontractors (Grade A and high B):

  • Ensure stable service quality
  • Minimize risks
  • Optimize management efficiency

Controlled Diversification

While focusing on good partners, don't depend too much on one subcontractor:

  • Don't let one partner hold >30-40% of volume
  • Maintain at least 3-5 main subcontractors for each service segment
  • Keep some backup partners with small volume

Assignment Matching Capabilities

Based on detailed data to assign appropriate work:

  • Partner A: VIP orders, difficult routes, urgent timing
  • Partner B: Standard orders, large stable volume
  • Partner C: Less important orders, flexible timing

Building Partner Development Program

Training and Technical Support

Based on weaknesses in subcontractor scorecard to:

  • Organize workshops on processes, technology
  • Share best practices from top partners
  • Support technology application deployment (GPS, mobile app)

Improvement Incentive Program

  • Bonus when achieving significant improvement milestones (e.g., 10-point increase in quarter)
  • Increase workload when promoted
  • Recognition and "Excellent Partner" award annually

Financial and Credit Support

For Grade A and high B partners:

  • Preferential payment terms
  • Advance costs for large projects
  • Introduce funding sources or bank guarantees

Regular Network Restructuring

Annual Strategic Review

Based on 12-month evaluation data to:

  • Identify service segments lacking quality partners
  • Assess geographic coverage level
  • Detect capability gaps (e.g., lack of cold chain partners)

New Partner Recruitment Plan

  • Launch partner search campaign for weak segments
  • Establish clear selection criteria
  • Structured onboarding and trial program

Eliminate Poor Performers

  • Terminate contracts with Grade D subcontractors
  • Gradually reduce dependence on Grade C partners without progress
  • Free management resources for more promising partners

Standardize and Scale Best Practices

Success Factor Analysis

From Grade A subcontractor data, identify:

  • Model operating processes
  • Technology and equipment they use
  • Driver training and management methods
  • Incident and complaint handling mechanisms

Build Guidelines and Standards

Compile best practice documents to:

  • Onboard new subcontractors faster
  • Upgrade capabilities of current partners
  • Create common standards for entire network

Connect and Share Among Partners

  • Organize forums or seminars for subcontractors
  • Create community to share experiences
  • Build culture of mutual development, not just competition

Tools and Templates to Support Building Evaluation Table in DeliTMS

To implement an effective logistics subcontractor management system, businesses need appropriate support tools. Modern TMS systems like DeliTMS often integrate many useful features.

Automation Features in TMS

Partner Performance Dashboard

Visual interface displaying:

  • Real-time scores of each subcontractor
  • Time-based trend charts
  • Comparison between partners
  • Alerts when incidents occur or sudden score drops

Automated KPI Reports

System automatically generates reports:

  • Aggregated by cycle (day, week, month, quarter)
  • Details of each metric and data source
  • Export Excel, PDF files for sharing
  • Automatic email to stakeholders

Review Management Workflow

  • Automatic reminders when evaluation period arrives
  • Electronic approval process
  • Store evaluation history and decisions
  • Track progress of improvement commitments

Customizable Scorecard Templates

Modern TMS partner evaluation systems typically provide ready-made templates, you can:

Select Appropriate KPI Set

  • Standard carrier KPI library by industry
  • Customize calculation formulas for each metric
  • Add company-specific KPIs

Adjust Weights and Scoring Scale

  • Drag-and-drop interface to allocate weights
  • Set score thresholds for each evaluation level
  • Preview results before applying

Configure Cycle and Process

  • Set evaluation frequency (monthly, quarterly, annual)
  • Identify person responsible for each step
  • Configure alerts and notifications

Integration and Extension

API for External Data Connection

  • Integration with ERP, accounting systems
  • Connection with customer survey platforms
  • Synchronize GPS and telematics data

Feedback and Improvement Module

  • Portal for subcontractors to view their scores
  • Send feedback and explanations about issues
  • Register improvement commitments and track progress

Advanced Analytics Reports

  • Correlation analysis between KPIs
  • Trend forecasting based on machine learning
  • Optimization suggestions based on historical data

Start Building Your Evaluation System

To successfully implement a transportation subcontractor evaluation system, follow these steps:

Step 1: Assess Current State (1-2 weeks)

  • Survey current partner evaluation methods
  • Identify available data in TMS
  • Interview related departments about needs

Step 2: Design System (2-3 weeks)

  • Select KPI set suitable for industry and strategy
  • Determine weights and scoring scale
  • Design data collection and processing process

Step 3: Trial Run (1-2 months)

  • Pilot with 3-5 major subcontractors
  • Collect feedback and adjust
  • Finalize templates and processes

Step 4: Official Implementation (1-2 months)

  • Announce and train all subcontractors
  • Apply widely to all partners
  • Monitor closely and support initial phase

Step 5: Continuous Improvement

  • Review system after 6 months and 12 months
  • Adjust KPIs and processes when needed
  • Expand to advanced modules

Conclusion

Building a professional transportation subcontractor evaluation system is an important investment that helps logistics businesses improve service quality, control costs, and minimize risks. By using actual data from TMS, establishing clear carrier KPIs and transparent evaluation processes, you can:

  • Make objective transportation contract renewal decisions based on data
  • Manage logistics subcontractors effectively with standardized subcontractor scorecard
  • Transportation network optimization by developing good partners and eliminating weak ones
  • Build a culture of continuous improvement throughout the supply chain

Start with simple steps: select 5-7 most important KPIs, collect data for 1-2 months, and create the first scorecard. From there, you can gradually refine and expand the system to achieve optimal efficiency in transportation partner management.